Philadelphia

100 South 7th Street, Philadelphia

Commercial buildingPublic Ledger Building

technical data · neighborhood and transit

Loading map…
100 South 7th Street, PhiladelphiaOpen map

Quick answers

Does 100 South 7th Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 60 permits, 34 not closed, and 60 violations, 17 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 100 South 7th Street at risk for?
FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave risk.

Permits and code violations

34 permits not closed out. Unfinished permits pass to the next owner. 17 open violations.

  1. Commercial building permit Sep 2026Issued

    For level ii alterations (no change in occupancy) at mechanical penthouse. separate permits required for mechanical, electrical, plumbing and fire suppression work.

  2. Plumbing permit Feb 2026Completed

    Repair/replace ct, fai, md & 6" wdp.

  3. Mechanical / fuel gas permit Aug 2025Issued

    For the installation of a new hvac systems, associated duct work, rooftop units, ductless systems, and relocated registers/diffusers as per approved plans. separate permit required for electrical, plumbing, fire suppression.

  4. General permit minor Aug 2025Expired

    Ez interior non-load-bearing wall demolition - for the interior demolition on non-load-bearing partition walls and ceilings as per attached standard. deviations from these standards require submission of construction and site plans. structural alteration or repair is expressly prohibited under this permit. prohibited structural work includes but not limited to any modification to exterior walls, party wall, floor/roof framing and foundations, including underpinning, excavation and removal of foundation slab. separate streets department permit required for sidewalk and street closures. removing interior partition walls

  5. Plumbing permit Jul 2025Issued

    Installing 1806 fixtures 277 hot water heaters 277 kitchen sinks 277 washer machines 325 toilets 325 shower/tubs 325 lavs

  6. Plumbing permit Jul 2025Expired

    Repair/replace ct, fai, md & 6" wdp.

  7. Electrical permit Jul 2025Issued

    Install temporary wiring for the work area. install 125 amp sub panel for each of the 275 dwelling unit. rewire building throughout and install lighting, switches and receptacle outlets. install 120 volts interconnected smoke and co alarms. all work to be done according to the 2017 nec and per plans.

  8. Fire suppression permit Jul 2025Issued

    For the installation of a new fire suppression system complying with nfpa 13 to accommodate a portion of an existing structure. installation to include 10." dc watts m200 backflow prevention assembly as per approved plans.**standpipe system in accordance with nfpa14 included ** all work shall be performed by a fire suppression contractor licensed by the city of philadelphia.**

  9. Commercial building permit May 2025Amendment applicant revisions

    For partial change of occupancy at 2nd floor to r-2 and level ii alterations for the creation of 25 dwelling units with mezzanine level to include horizontal exit, new partitions, fixtures, furnishings, finishes as per approved plans. separate permits required for any mep and fire suppression work. work area to be sprinklered as per bbs variance. *2018 iebc*

  10. Zoning permit Feb 2025Issued

    Residential - household living - multi-family

  11. Commercial building permit Sep 2024Amendment review

    For level iii alterations to an existing highrise building as per plans. alterations limited to the 3rd-13th floor to include the erection of partition walls, provide finishes/furnishings and accessibility improvements throughout. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits to be obtained for all other work. *amend 10-16-24; revise cost of construction per executed contract* *amend 8-31-25; revise layout at 13th floor per approved construction documents* *amendment 9/3/2026 for floor infills and openings at 3rd-7th floor.*

  12. Zoning permit Nov 2023Issued

    Residential - household living - multi-family; office - business and professional

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Moderate

Highest for this area: heat wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Superfund site

2.3 mi

Martin Aaron, Inc. (NPL Site). Check groundwater and vapor reports on the EPA site page.

EPA National Priorities List

Leaking fuel tanks

5 within 1,650 ft

Nearest: Five Star Parking, 727-35 Chestnut St (600 ft), no further action. Every release here is closed by the state regulator.

EPA UST Finder, leaking underground storage tank releases

Toxic release facility

1,250 ft

Trigen Philadelphia Energy Corp Edison Facility and 2 more within a mile. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

550 ft

National Constitution Center HS (550 ft), Mastery CHS-Lenfest Campus (1,250 ft), McCall Gen George A Sch (1,600 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

7.1 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 100 South 7th Street, Philadelphia

Building typeCommercial building

Worked or visited at Public Ledger Building? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on South 7th Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.