129 Pali Avenue, Los Angeles
technical data · neighborhood and transit
Quick answers
- Does 129 Pali Avenue have open permits or code violations?
- Los Angeles Department of Building and Safety lists 11 permits, 5 not closed, and 0 violations.
- What is the 2026 conforming loan limit in Los Angeles County?
- $1,249,125 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 129 Pali Avenue at risk for?
- FEMA's National Risk Index rates the area relatively moderate overall, with elevated earthquake and wildfire risk.
Permits and code violations
5 permits not closed out. Unfinished permits pass to the next owner.
- Bldg-alter/repair Jul 2026Issued
Re-roof with class a or b roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 23 squares. class a roof covering is required within very high fire hazard severity zone (vhfhsz). for residential roof replacement > 50% of the total roof area, apply cool roof product labeled and certified by cool roof rating council (crrc). cool roof may be required for non-residential buildings per title 24, part 6, section 141.0(b)2b.
- Bldg-alter/repair Jun 2026Issued
Suppl. permit to 26014-20000-01665 to revise the strucutral and remove a door.
- Bldg-addition Jun 2026Issued
Addition to sfd 1-story.
- Bldg-alter/repair Apr 2026Permit finaled
Re-roof with class a or b roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 squares. class a roof covering is required within very high fire hazard severity zone (vhfhsz). for residential roof replacement > 50% of the total roof area, apply cool roof product labeled and certified by cool roof rating council (crrc). cool roof may be required for non-residential buildings per title 24, part 6, section 141.0(b)2b.
- Bldg-alter/repair Mar 2026Permit finaled
Supplemental permit to 26016-10000-04644 mto change work decription to: (vinyl) (wood)(fiber cement) (others: ) siding over solid sheathing with an approved water-resistive barrier per valid icc evaluation report # 2290 on exterior walls at 5 feet or more from property lines for residential buildings. (applicant to provide a copy of the report to inspector
- Bldg-alter/repair Feb 2026Issued
Replace existing siding with new stucco for single family dwellings and duplex only.
- Bldg-alter/repair Nov 2022Permit finaled
A supplemental permit to 20014-10000-01835 to remove reqired sprinkler nfpa-13d from structural inventory."no fee-department error."
- Bldg-alter/repair Apr 2021Permit finaled
Chimney repair per l.a. city standard plan.
- Bldg-alter/repair Mar 2021Permit finaled
Supplemental to permit # 20014-10000-01835change the engineer of record on application. no change in plans.
- Bldg-addition Nov 2020Cofo issued
Add ground floor and a 2nd story addition to an existing family dwelling with attached garage.
- Bldg-alter/repair Jun 2020Permit finaled
Complete work done per permit application #02014-20000-06352 - 75% completion per inspection notice. orginal scope of work "extend (e)19' x 12' patio cover to (n)40' x 12' (addition of 21' x 12') to rear of (e) sfd per la city std detail & type v sheet. 15 window change-outs (same size and location)"
Los Angeles Department of Building and Safety
Safety and environment
FEMA natural hazard risk
Relatively Moderate
Highest for this area: earthquake, wildfire, inland flooding. These drive insurance cost here.
FEMA National Risk Index, census tract
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Wildfire risk
Relatively High
Some insurers limit new policies in high wildfire areas. Get a home insurance quote before you commit.
FEMA National Risk Index
Nearest public schools
700 ft
Mountain View Elementary (700 ft), Pinewood Avenue Elementary (4,800 ft), Dunsmore Elementary (5,000 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Major airport
6.0 mi
Hollywood Burbank (BUR). Aircraft may be audible under approach paths.
FAA large-hub airports
Conforming loan limit 2026
$1,249,125
Los Angeles County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
Who lives and works in Los Angeles
Entertainment, trade and an economy spread across dozens of centers
Los Angeles has no single downtown. Work is spread between studios, the port, aerospace campuses and healthcare systems, so the neighborhood you pick decides your commute more than in any other American city.
- $80,366
- median household income
- 16.7%
- residents aged 25 to 34
- 37%
- households that own their home
What pays the bills
- Entertainment
- Trade and logistics
- Aerospace
- Healthcare
- Apparel
Who anchors the economy
Disney · Netflix · Port of Los Angeles · SpaceX · UCLA Health
The market is shaped around
- Creative and production workers
- Car commuters
- Multigenerational households
More on Pali Avenue
All addressesViewing recommendations
What's worth checking in person before deciding.
- This is a house, not an apartment. Check the lot boundaries, car access, and how water drains from the yard after rain, including whether the neighboring lot sits higher and could send water toward the property.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Check the condition of the fence, yard, and sidewalk out front: who is responsible for upkeep, and whether there are any boundary disputes with neighbors.
- Ask what heating system is in place (own boiler, wood, gas) and request the last winter month's bills.
- Check the sewer connection (public network or septic tank) and the water source (public network or well), including pressure and water quality.
- Ask to see the construction documents (permit, sign-off) and check for visible cracks on the facade or in the attic/basement.
- Check the roof, gutters, and downspouts for signs of leaks or recent repairs, especially if it has rained recently.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.