701 South Wells Street, Chicago
technical data · neighborhood and transit
Quick answers
- Does 701 South Wells Street have open permits or code violations?
- Chicago Department of Buildings lists 60 permits, 37 not closed, and 60 violations, 21 open.
- What is the 2026 conforming loan limit in Cook County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 701 South Wells Street at risk for?
- FEMA's National Risk Index rates the area relatively high overall, with elevated tornado and inland flooding risk.
Permits and code violations
37 permits not closed out. Unfinished permits pass to the next owner. 21 open violations.
- Permit – express permit program Nov 2026Active
Low voltage/communication electrical work. install other. specific location: 6th floor.
- Permit – express permit program Oct 2026Active
Temporary scaffolding: qty: 1, max. length: 155 ft., max. height: 325 ft. location: all exterior facade elevations. permit expiration date: 365 days from permit issued date
- Permit – express permit program Sep 2026Active
Low voltage/communication electrical work. install security. specific location: 6th flr.
- Permit - renovation/alteration Jun 2026Active
Dds 2019 cbc: interior alterations to existing 6th floor data center (includes replacement of 5 existing ahus with 6 new crah units, new air cooled chillers on the roof, roof modification to accomodate new units & new guard rail and grating surrounding the units) (occupany group b & s-1. type ia construction) consultant reviewer: v3 companies of il
- Permit – express permit program Sep 2025Active
Temporary scaffolding: qty: 2, max. length: 130 ft., max. height: 340 ft. location: all exterior facade elevations. permit expiration date: 365 days from permit issued date
- Permit – express permit program Oct 2024Suspended
Concrete masonry repair / replacemnt: 100sq. ft., excavation = . location: all elevations.
- Permit – express permit program Oct 2024Complete
Temporary scaffolding: qty: 1, max. length: 28 ft., max. height: 350 ft. location: all elevations. permit expiration date: 365 days from permit issued date
- Permit – express permit program Mar 2024Complete
Temporary scaffolding: qty: 1, max. length: 95 ft., max. height: 110 ft. location: all facade elevations. permit expiration date: 365 days from permit issued date
- Permit – express permit program Mar 2024Complete
Install (2) 144 strand fiber runs from the 6th to the 9th floors-install cable tray to support fiber runs. terminations and testing of fiber job # 2180058
- Permit – express permit program Oct 2023Complete
**fire alarm permit**installation of fire alarm system in data center on 9th floor. connection to existing approved high-rise fire alarm & voice system.
- Permit - scaffolding Sep 2023
Erect one (1) scaffold dates 09/15/2023 through 09/15/2024
- Permit - easy permit process Jun 2023
Remove/replacer wet insulation areas,install new (24)ga. gutters & downspouts.coat entire roof with sikalastic coating.no structual work(10,500 sq ft).
Chicago Department of Buildings
Safety and environment
FEMA natural hazard risk
Relatively High
Highest for this area: tornado, inland flooding, heat wave, cold wave. These drive insurance cost here.
FEMA National Risk Index, census tract
Leaking fuel tanks
12 within 1,650 ft
Nearest: B&B Parking, 633 South La Salle St. (450 ft), open. 2 still open. Ask whether groundwater or soil vapor testing was done.
EPA UST Finder, leaking underground storage tank releases
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
1,450 ft
Jones College Prep High School (1,450 ft), South Loop Elem School (2,650 ft), Intrinsic 2 Charter High School (2,800 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Major airport
8.5 mi
Chicago Midway (MDW). Aircraft may be audible under approach paths.
FAA large-hub airports
Conforming loan limit 2026
$832,750
Cook County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
Who lives and works in Chicago
Trading floors, logistics and the deepest architecture stock in America
Chicago carries a full corporate economy at a price the coasts do not match. Neighborhoods are distinct and walkable, two and three flats are everywhere, and the Loop still sets the commute for finance, law and consulting.
- $71,673
- median household income
- 18.9%
- residents aged 25 to 34
- 45%
- households that own their home
What pays the bills
- Finance and trading
- Logistics and rail
- Law and consulting
- Healthcare
- Manufacturing
Who anchors the economy
CME Group · Boeing suppliers · University of Chicago · Northwestern Medicine · United Airlines
The market is shaped around
- Young professionals
- Families buying space
- Two and three flat owners
More on South Wells Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.