6069-6071 North Milwaukee Avenue, Chicago
technical data · neighborhood and transit
Quick answers
- Does 6069-6071 North Milwaukee Avenue have open permits or code violations?
- Chicago Department of Buildings lists 11 permits, 5 not closed, and 11 violations, 6 open.
- What is the 2026 conforming loan limit in Cook County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 6069-6071 North Milwaukee Avenue at risk for?
- FEMA's National Risk Index rates the area relatively moderate overall, with elevated tornado and heat wave risk.
Permits and code violations
5 permits not closed out. Unfinished permits pass to the next owner. 6 open violations.
- Permit - new construction Aug 2026Active
Permit expires on 10/26/2026 erection starts: 9/10/2026, erection ends: 9/13/2026. cbc 2019. reinstatement of 2024 permit 101057461 for the 2026 gladstone park throwback music fest stage on sept 11-13. setup 9-10-26 and takedown 9-13-26. same 1-24x20 mobile stage with wings. special events services group.
- Permit - new construction Jul 2025Complete
Permit expires on 09/30/2025 erection starts: 9/5/2025, erection ends: 9/7/2025. cbc 2019. reinstatement of 2024 permit 101057461 for the 2025 gladstone park throwback music fest stage on sept 5-7. setup 9-5-25 and takedown 9-7-25. same 1-24x20 mobile stage with wings. special events services group.
- Permit - new construction Aug 2024Expired
Permit expires on 10/13/2024 erection starts: 9/6/2024, erection ends: 9/8/2024. cbc 2019. 2024 gladstone park throwback music fest stage on sept 6-8. 1-24x20 mobile stage with wings. special events services group.
- Permit - signs Nov 2023
Install two (2) new lexan faces onto existing freestanding illuminated double face pole sign at north end of lot.
- Permit - new construction Jul 2023Complete
Permit expires on 09/25/2023 erection starts: 9/8/2023, erection ends: 9/10/2023. gladstone park chamber of commerce fest 2023- mobile stage mobile stage- 3 day event (9/8-10/2023)erect one (1) sl100- mobile stage 20x24 w/ 8x4 stage right, 8x4 stage left. setup 9/8/2023 - remove 9/10/2023assembly
- Permit - signs Aug 2021
Led illuminated freestanding sign.freestanding sign located at the northwest side of the parking lot facing northwest and southeast onto milwaukee.
- Permit - signs Aug 2019
No illuminated wall sign on the northwest elevation facing northwest onto parking lot.
- Permit - renovation/alteration Dec 2015Complete
Install (3) new windows as per plans
- Permit – express permit program Sep 2011Complete
Mak trucking inc toni gjroeki job 329-13954 installation of a low voltage security alarm system
- Permit – express permit program Mar 2011Complete
Installation of a low voltage security alarm system 329-13216-01 speed motion performance automotive anthony lavletta
- Permit – express permit program Feb 2006Complete
Change new panel box 200 amp. three phase and replace wiring only.
Chicago Department of Buildings
Safety and environment
FEMA natural hazard risk
Relatively Moderate
Highest for this area: tornado, heat wave, cold wave. These drive insurance cost here.
FEMA National Risk Index, census tract
Leaking fuel tanks
3 within 1,650 ft
Nearest: Buda, Gina, 6173 North Elston Ave. (450 ft), no further action. Every release here is closed by the state regulator.
EPA UST Finder, leaking underground storage tank releases
Toxic release facility
2,750 ft
Alert Spray Corp and 2 more within a mile. Reports chemical releases to air, water or land to EPA each year.
EPA Toxics Release Inventory
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
2,850 ft
Onahan Elem School (2,850 ft), Hitch Elem School (3,000 ft), Taft High School (3,600 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Major airport
6.4 mi
Chicago O'Hare (ORD). Aircraft may be audible under approach paths.
FAA large-hub airports
Sinkhole-prone ground
Limestone karst
The bedrock here (dolostone (dolomite), Silurian) can dissolve and open sinkholes. Ask for a geotechnical report and check whether sinkhole coverage is in the insurance policy.
USGS Karst in the United States (OFR 2014-1156)
Conforming loan limit 2026
$832,750
Cook County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
Who lives and works in Chicago
Trading floors, logistics and the deepest architecture stock in America
Chicago carries a full corporate economy at a price the coasts do not match. Neighborhoods are distinct and walkable, two and three flats are everywhere, and the Loop still sets the commute for finance, law and consulting.
- $71,673
- median household income
- 18.9%
- residents aged 25 to 34
- 45%
- households that own their home
What pays the bills
- Finance and trading
- Logistics and rail
- Law and consulting
- Healthcare
- Manufacturing
Who anchors the economy
CME Group · Boeing suppliers · University of Chicago · Northwestern Medicine · United Airlines
The market is shaped around
- Young professionals
- Families buying space
- Two and three flat owners
More on North Milwaukee Avenue
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.