5261 West Lexington Street, Chicago
technical data · neighborhood and transit
Quick answers
- Does 5261 West Lexington Street have open permits or code violations?
- Chicago Department of Buildings lists 8 permits, 4 not closed, and 58 violations, 38 open.
- What is the 2026 conforming loan limit in Cook County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 5261 West Lexington Street at risk for?
- FEMA's National Risk Index rates the area relatively moderate overall, with elevated tornado and inland flooding risk.
Permits and code violations
4 permits not closed out. Unfinished permits pass to the next owner. 38 open violations.
- Permit – express permit program Apr 2024Suspended
Correct list electrical violations from city of chicago only.
- Permit - new construction Jun 2021Complete
Permit expires on 08/24/2021 erection starts: 7/1/2021, erection ends: 10/1/2021. canopy- self-cert, 60 day event (7/01/2021-10/01/2021) sos- lexington 2 erect one (1) 15x60 frame canopy. setup 7/01/2021- remove 10/01/2021 assembly **** self certification **** conditional approval **** subject to field inspection **** aor certificate of inspection required ****
- Permit - new construction Jun 2021Complete
Permit expires on 08/23/2021 erection starts: 6/25/2021, erection ends: 9/30/2021. tent- reinstate 100880206,60 day event (6/25/2021-9/30/2021) sos- lexington erect one (1) 10x140 frame tent. setup 6/25/2021- remove 9/30/2021 assembly **** self certification ***** conditional approval **** subject to field inspection **** aor certificate of inspection required ****
- Permit - easy permit process May 2021
Fences: 152ft 0in x 6ft 0in: qty 1, windows (replacement only): qty 2, doors (replacement only): qty 7
- Permit - new construction Aug 2020Complete
Permit expires on 10/31/2020 erection starts: 9/6/2020 erection ends: 11/6/2020 tent- reinstate 100880206,60 day event (9/6/2020-11/6/2020) sos- lexington erect one (1) 10x140 frame tent. all ready up 9/6/2020- remove 11/6/2020 assembly **** self certification ***** conditional approval **** subject to field inspection **** aor certificate of inspection required ****
- Permit - new construction Jul 2020Complete
Permit expires on 09/02/2020 erection starts: 7/6/2020, erection ends: 9/6/2020. tent- cbc 2019, selfcert - 60 day event 7/6/2020-9/6/2020, sos- lexington, erect one (1) 10x140 frame tent. setup 7/6/2020- remove 9/6/2020 assembly **** self certification ***** conditional approval **** subject to field inspection **** aor certificate of inspection required ****
- Permit - signs Dec 2013
Installing one 3'-0" x 6'-0" interior illuminatedsingle face ground signmounted on private
- Permit - easy permit process Jan 2013
Porch repairs as per violations.
Chicago Department of Buildings
Safety and environment
FEMA natural hazard risk
Relatively Moderate
Highest for this area: tornado, inland flooding, heat wave, cold wave. These drive insurance cost here.
FEMA National Risk Index, census tract
Leaking fuel tanks
7 within 1,650 ft
Nearest: Kooy, Larry, 5447 West Harrison St. (1,150 ft), open. 2 still open. Ask whether groundwater or soil vapor testing was done.
EPA UST Finder, leaking underground storage tank releases
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
1,400 ft
Clark Acad Prep Magnet High Schl (1,400 ft), Plato Learning Acad Elem School (1,850 ft), Leland Elem School (2,250 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Major airport
5.8 mi
Chicago Midway (MDW). Aircraft may be audible under approach paths.
FAA large-hub airports
Sinkhole-prone ground
Limestone karst
The bedrock here (dolostone (dolomite), Silurian) can dissolve and open sinkholes. Ask for a geotechnical report and check whether sinkhole coverage is in the insurance policy.
USGS Karst in the United States (OFR 2014-1156)
Conforming loan limit 2026
$832,750
Cook County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
Who lives and works in Chicago
Trading floors, logistics and the deepest architecture stock in America
Chicago carries a full corporate economy at a price the coasts do not match. Neighborhoods are distinct and walkable, two and three flats are everywhere, and the Loop still sets the commute for finance, law and consulting.
- $71,673
- median household income
- 18.9%
- residents aged 25 to 34
- 45%
- households that own their home
What pays the bills
- Finance and trading
- Logistics and rail
- Law and consulting
- Healthcare
- Manufacturing
Who anchors the economy
CME Group · Boeing suppliers · University of Chicago · Northwestern Medicine · United Airlines
The market is shaped around
- Young professionals
- Families buying space
- Two and three flat owners
More on West Lexington Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.