3040 South Haynes Court, Chicago
technical data · neighborhood and transit
Quick answers
- Does 3040 South Haynes Court have open permits or code violations?
- Chicago Department of Buildings lists 11 permits, 7 not closed, and 0 violations.
- What is the 2026 conforming loan limit in Cook County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 3040 South Haynes Court at risk for?
- FEMA's National Risk Index rates the area relatively moderate overall, with elevated tornado and heat wave risk.
Permits and code violations
7 permits not closed out. Unfinished permits pass to the next owner.
- Permit – express permit program Aug 2024Complete
Install solar panels on roof of principal building. roof type: sloped (2:12 to 5:12). inverter output: 11.5 kw. array output: 8.1 kw. includes 13.5 kwh energy storage system. location: pv on primary structure, ess/inverter on garage. icc distributed generation installer cert. #18-0853.
- Permit – express permit program Feb 2024Suspended
Install underground for future solar
- Permit – express permit program Feb 2024Suspended
1. remove existing 100 amp service and replace with a new 200 amp service. 2. furnish and install (1) 200 amp over head meter fitting, 2" rigid conduit service riser, and #3/0 awg thhn copper service entrance conductors. 3. furnish and install (1) siemens brand 200 amp 40 circuit panel. 4. furnish and install all new breakers and label them as to which circuits they feed. 5. furnish and installation new grounding that complies with current codes. this includes (1) ground rods and (1) water ground. proposal includes installing (1) 3/4" conduit to the water main with a #4 awg grounding conductor. 6. coordinate all permits, inspections, and paperwork with the city of chicago 7. proposal does not include any permit fees or fees incurred by com ed. (none anticipated)
- Permit - easy permit process Aug 2021
Tuckpointing(1000 sqft)no struckaul work.
- Permit – express permit program Feb 2021Complete
Install tesla wall connector in garage
- Permit - easy permit process Oct 2017
Revision to permit #100675246 to change plumber of record to jas mechanical, llc.
- Permit - renovation/alteration Dec 2016Complete
De conversion from multi dwelling into single family residence, the renovation of the front basement, 1st & 2nd floor, with new electrical, plumbing hvac and architectural per plans **certified plans corrections: conditional permit subject to field inspections **
- Permit – express permit program Aug 2016Complete
Secure and relocate damaged electrical service mast for building. electrical repair of exterior electrical service mask only. no additional electrical work or circuits for interior of building.
- Permit - easy permit process Jun 2015
Repair/replace bricks and tuckpoint. replace window lintels as needed. no structural. work on all elevations.
- Permit - easy permit process Jul 2012
Correct masonry per building violations including repairing 800sf of masonry & replace appx 200 damaged bricks (no structural work)- all work same as existing; (no lintels over 6' long to be replaced under this permit) subject to field inspections
- Permit - easy permit process May 2009
Hot water heater (replacement only): qty 1
Chicago Department of Buildings
Safety and environment
FEMA natural hazard risk
Relatively Moderate
Highest for this area: tornado, heat wave, cold wave. These drive insurance cost here.
FEMA National Risk Index, census tract
Leaking fuel tanks
5 within 1,650 ft
Nearest: Bridgestone Transmission, 936 West 31st St. (1,550 ft), open. 2 still open. Ask whether groundwater or soil vapor testing was done.
EPA UST Finder, leaking underground storage tank releases
Toxic release facility
1,250 ft
Aztec Material Service Co and 17 more within a mile. Reports chemical releases to air, water or land to EPA each year.
EPA Toxics Release Inventory
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
500 ft
Holden Elem School (500 ft), Armour Elem School (2,200 ft), Healy Elem School (4,100 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Major airport
6.1 mi
Chicago Midway (MDW). Aircraft may be audible under approach paths.
FAA large-hub airports
Conforming loan limit 2026
$832,750
Cook County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
Who lives and works in Chicago
Trading floors, logistics and the deepest architecture stock in America
Chicago carries a full corporate economy at a price the coasts do not match. Neighborhoods are distinct and walkable, two and three flats are everywhere, and the Loop still sets the commute for finance, law and consulting.
- $71,673
- median household income
- 18.9%
- residents aged 25 to 34
- 45%
- households that own their home
What pays the bills
- Finance and trading
- Logistics and rail
- Law and consulting
- Healthcare
- Manufacturing
Who anchors the economy
CME Group · Boeing suppliers · University of Chicago · Northwestern Medicine · United Airlines
The market is shaped around
- Young professionals
- Families buying space
- Two and three flat owners
More on South Haynes Court
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.