Chicago

2026-2028 North Orleans Street, Chicago

technical data · neighborhood and transit

Loading map…
2026-2028 North Orleans Street, ChicagoOpen map

Quick answers

Does 2026-2028 North Orleans Street have open permits or code violations?
Chicago Department of Buildings lists 23 permits, 11 not closed, and 21 violations, 11 open.
What is the 2026 conforming loan limit in Cook County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 2026-2028 North Orleans Street at risk for?
FEMA's National Risk Index rates the area relatively low overall, with elevated tornado and heat wave risk.

Permits and code violations

11 permits not closed out. Unfinished permits pass to the next owner. 11 open violations.

  1. Permit – express permit program Oct 2026Complete

    Other administrative change associated with permit 101084808. details: please remove the electrical, hvac, and plumbing contractors from the permit. they were accidentally added to hansen, but they were not listed on the building application and are not required.. administrative filing only. no substantive change to scope of permit 101084808.

  2. Permit - renovation/alteration Sep 2026Active

    Self certification 2019 cbrc.renovation of existing garage roof deck with new non-combustible steel pergola. all work as per plans.

  3. Permit – express permit program Sep 2025Complete

    For permit 101048663: replacement mason contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.

  4. Permit - renovation/alteration Sep 2025Complete

    Spr - 2019 cbc - interior alteration, deconvert form 6 du to 5 du, new rear 4 story masonry addition and new 4th floor upper story addition, the extension of the exist builidng side exterior walls with new front 4th floor roof deck and underpinning of exist basement and new to new 4th story portion at existing 3 story multi-dwelling unit masonry building w/ basement. new masonry garage w/ rooftop deck and rear raised patio as per plans(occupancy class r-2, construction type iiia)**certified corrections subject to field inspections & audit **

  5. Permit - wrecking/demolition Jun 2025Complete

    Wreck and remove a an oversized masonry garage only. no work to front building.

  6. Permit - easy permit process Aug 2022

    Revision to permit no 100956922 to change window types 1-i and 2-1 from wood brick moulds to aluminum brick moulds. no change to windows themselves.

  7. Permit - renovation/alteration Apr 2022Expired

    2019 cbc interior alterations to existing sfr w/ exterior work replace front stair with same kind and balcony as per plans.

  8. Permit - renovation/alteration Dec 2021Expired

    Sc 2019 cbrc: de-conversion, interior remodeling and a 2-story 193 sf masonry addition of an existing 3 story multi-family masonry residence to a residential 2-flat and the construction of a new detached 2 car masonry garage per plans.(r5 use - iiib const.) sprinkler system installation reviewed separately by the fire dept.

  9. Permit - scaffolding Mar 2021

    Erect one scaffold from 03/26/2021 to 03/26/2022.

  10. Permit - easy permit process Mar 2021

    Area of work appx 400 sq ft at east elevation: tuckpointing. replace bricks. cleaning (no chemical cleaning)- (no structural work)- all work same as existing; subject to field inspections

  11. Permit - renovation/alteration Jun 2018Complete

    Renovation of existing front yard stairs and yard to existing multi-unit residential a-2 occupancy structure. construction class 3b. no change to existing occupancy or construction class.

  12. Permit - renovation/alteration Jun 2017Complete

    Demolition and rebuilding of existing garage on existing foundations to remain. use will remain as garage.

Chicago Department of Buildings

Safety and environment

FEMA natural hazard risk

Relatively Low

Highest for this area: tornado, heat wave, cold wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Leaking fuel tanks

3 within 1,650 ft

Nearest: Orleans Clark Holdings, Llc, 2036 North Clark Street (350 ft), open. 2 still open. Ask whether groundwater or soil vapor testing was done.

EPA UST Finder, leaking underground storage tank releases

Toxic release facility

4,350 ft

Midwest Zinc Corp Chicago Facility and 4 more within a mile. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

1,950 ft

LaSalle Elem Language Academy (1,950 ft), Lincoln Park High School (2,000 ft), Lincoln Elem School (2,600 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Conforming loan limit 2026

$832,750

Cook County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 2026-2028 North Orleans Street, Chicago

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

Who lives and works in Chicago

Trading floors, logistics and the deepest architecture stock in America

Chicago carries a full corporate economy at a price the coasts do not match. Neighborhoods are distinct and walkable, two and three flats are everywhere, and the Loop still sets the commute for finance, law and consulting.

$71,673
median household income
18.9%
residents aged 25 to 34
45%
households that own their home

What pays the bills

  • Finance and trading
  • Logistics and rail
  • Law and consulting
  • Healthcare
  • Manufacturing

Who anchors the economy

CME Group · Boeing suppliers · University of Chicago · Northwestern Medicine · United Airlines

The market is shaped around

  • Young professionals
  • Families buying space
  • Two and three flat owners
Read the Chicago city report →

More on North Orleans Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.