181 North La Crosse Avenue, Chicago
technical data · neighborhood and transit
Quick answers
- Does 181 North La Crosse Avenue have open permits or code violations?
- Chicago Department of Buildings lists 12 permits, 6 not closed, and 31 violations, 30 open.
- What is the 2026 conforming loan limit in Cook County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 181 North La Crosse Avenue at risk for?
- FEMA's National Risk Index rates the area relatively high overall, with elevated tornado and inland flooding risk.
Permits and code violations
6 permits not closed out. Unfinished permits pass to the next owner. 30 open violations.
- Permit - reinstate revoked pmt Nov 2026
Final reinstatement of permit no 100743180, must begin work and request inspections no later than may 2027 on permit no 100743180
- Permit – express permit program Jun 2026Active
Tuckpointing and unit masonry repair / replacement: 3600 sq. ft., lintel qty. 6, max. length 6. parapet rebuilding: 20 sq. ft. location: exteriormasonary work.
- Permit – express permit program Nov 2025Active
In-kind replacement of exterior windows and doors in existing openings. replacement windows: 25; replacement skylights: 0; replacement doors: 0. affects: 2 residential unit(s), 0 non-residential unit(s), 3 interior common areas, location: first, second, basement.
- Permit - reinstate revoked pmt Apr 2022
Reinstate permit no 100743180, must begin construction and request inspections no later than 8.07.22
- Permit - renovation/alteration Aug 2018Complete
Interior alteration to 2 story 4 du masonry bldg to include new mech, elect. & plumb per plans. remove & replace 2 story open rear wood frame porch to be same as existing per plans.
- Permit - renovation/alteration May 2018Complete
Fire damaged repairs 2 story 2du brick building. basement deconversion to original use. all work as per plans.
- Permit - renovation/alteration Jul 2012Complete
Remodel existing kitchens, baths, replace drywall, install new furnaces as per plans
- Permit – express permit program Jan 2012Complete
Installing pipe and wiring. replace outlets, lights and switches install new circuits. 120/240v single phase 3 wire 100 amp service 1 meter.
- Permit - easy permit process Jun 2009
Repair\replace drywall, electrical (circuits, lighting & receptacles) & and plumbing. subject to field inspections
- Permit – express permit program Feb 2009Complete
Piping, wiring and install 100amp, 1ph, 3w electric service and bank of 3 meters - 2 meters for apartments and 1 for public.
- Permit - easy permit process Aug 2008
Windows (replacement only): qty 7, doors (replacement only): qty 6
- Permit - wrecking/demolition Oct 2006Complete
Wreck and remove a one story frame garage.
Chicago Department of Buildings
Safety and environment
FEMA natural hazard risk
Relatively High
Highest for this area: tornado, inland flooding, heat wave, cold wave. These drive insurance cost here.
FEMA National Risk Index, census tract
Leaking fuel tanks
4 within 1,650 ft
Nearest: Ace Foundry Co., 353 North Lamon Ave. (1,150 ft), no further action. Every release here is closed by the state regulator.
EPA UST Finder, leaking underground storage tank releases
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
1,200 ft
Spencer Technology Acad Elem Sch (1,200 ft), YCCS-Scholastic Achievement HS (1,850 ft), Excel Safe Academy West (1,850 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Major airport
6.7 mi
Chicago Midway (MDW). Aircraft may be audible under approach paths.
FAA large-hub airports
Sinkhole-prone ground
Limestone karst
The bedrock here (dolostone (dolomite), Silurian) can dissolve and open sinkholes. Ask for a geotechnical report and check whether sinkhole coverage is in the insurance policy.
USGS Karst in the United States (OFR 2014-1156)
Conforming loan limit 2026
$832,750
Cook County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
Who lives and works in Chicago
Trading floors, logistics and the deepest architecture stock in America
Chicago carries a full corporate economy at a price the coasts do not match. Neighborhoods are distinct and walkable, two and three flats are everywhere, and the Loop still sets the commute for finance, law and consulting.
- $71,673
- median household income
- 18.9%
- residents aged 25 to 34
- 45%
- households that own their home
What pays the bills
- Finance and trading
- Logistics and rail
- Law and consulting
- Healthcare
- Manufacturing
Who anchors the economy
CME Group · Boeing suppliers · University of Chicago · Northwestern Medicine · United Airlines
The market is shaped around
- Young professionals
- Families buying space
- Two and three flat owners
More on North La Crosse Avenue
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.