142-148 East Ontario Street, Chicago
technical data · neighborhood and transit
Quick answers
- Does 142-148 East Ontario Street have open permits or code violations?
- Chicago Department of Buildings lists 60 permits, 36 not closed, and 48 violations, 8 open.
- What is the 2026 conforming loan limit in Cook County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 142-148 East Ontario Street at risk for?
- FEMA's National Risk Index rates the area relatively low overall, with elevated tornado and cold wave risk.
Permits and code violations
36 permits not closed out. Unfinished permits pass to the next owner. 8 open violations.
- Permit – express permit program Nov 2026Active
Fire alarm: modification of existing system. associated building permit:101085366. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising station . specific location: 12th floor.
- Permit – express permit program Jul 2026Active
Fire alarm: modification of existing system. associated building permit:101081627. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising station . specific location: 5th floor.
- Permit - renovation/alteration Jul 2026Active
Self-cert 2019 cbrc: interior alterations in existing office building on the 5th floor, office suite 502. new partitions, doors, ceilings, lighting, millwork, and finishes. new electrical, mechanical and plumbing work as per plans. (occupancy group b; type 1a construction)
- Permit - renovation/alteration Jul 2026Active
Self-cert 2019 cbrc: interior alterations in existing office building on the 12th floor, office suite 1250. new partitions, doors, ceilings, lighting, millwork, and finishes. associated electrical, mechanical and plumbing work as per plans. (occupancy group b; type 1a construction)
- Permit – express permit program Apr 2026Complete
Change of owner for permit b200461985. new owner listed on this permit.
- Permit - renovation/alteration Apr 2026Complete
Self-cert 2019 cbrc: interior alterations in existing office building on the 5th floor, office suite 500. new partitions, doors, ceilings, lighting, millwork, and finishes. new electrical, mechanical and plumbing work as per plans. (occupancy group b; type 1a construction)
- Permit – express permit program Mar 2026Active
Repair/replacement affecting 1 systems : 1 fan coil unit(tag: wshp-1 - model se072, 17 gpm, 460v 3ph (horizontal)) . electrical work under this permit = no . locations: 0 residential unit(s), 1 non-residential unit(s), 1st floor.
- Permit – express permit program Dec 2025Active
Low voltage/communication electrical work. install data/video. specific location: 9th floor.
- Permit – express permit program Nov 2025Active
Fire alarm: modification of existing system. associated building permit:101073978. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising station . specific location: 9th floor tenant.
- Permit – express permit program Oct 2025Active
Low voltage/communication electrical work. install data/video. specific location: floor 9 suite 900.
- Permit – express permit program Oct 2025Active
Temporary scaffolding: qty: 1, max. length: 5 ft., max. height: 222 ft. location: southeast corner. permit expiration date: 365 days from permit issued date this permit is not valid without corresponding cdot public way permit.
- Permit – express permit program Oct 2025Complete
For permit 101073978: replacement plumbing contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Chicago Department of Buildings
Safety and environment
FEMA natural hazard risk
Relatively Low
Highest for this area: tornado, cold wave. These drive insurance cost here.
FEMA National Risk Index, census tract
Leaking fuel tanks
23 within 1,650 ft
Nearest: Dancona & Co., 247 East Ohio St. (850 ft), no further action. Every release here is closed by the state regulator.
EPA UST Finder, leaking underground storage tank releases
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
2,850 ft
Ogden Elem School (2,850 ft), Salazar Elem Bilingual Center (4,050 ft), YCCS-Innovations of Arts Integr (4,100 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Major airport
9.9 mi
Chicago Midway (MDW). Aircraft may be audible under approach paths.
FAA large-hub airports
Sinkhole-prone ground
Limestone karst
The bedrock here (dolostone (dolomite), Silurian) can dissolve and open sinkholes. Ask for a geotechnical report and check whether sinkhole coverage is in the insurance policy.
USGS Karst in the United States (OFR 2014-1156)
Conforming loan limit 2026
$832,750
Cook County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Worked or visited here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
Who lives and works in Chicago
Trading floors, logistics and the deepest architecture stock in America
Chicago carries a full corporate economy at a price the coasts do not match. Neighborhoods are distinct and walkable, two and three flats are everywhere, and the Loop still sets the commute for finance, law and consulting.
- $71,673
- median household income
- 18.9%
- residents aged 25 to 34
- 45%
- households that own their home
What pays the bills
- Finance and trading
- Logistics and rail
- Law and consulting
- Healthcare
- Manufacturing
Who anchors the economy
CME Group · Boeing suppliers · University of Chicago · Northwestern Medicine · United Airlines
The market is shaped around
- Young professionals
- Families buying space
- Two and three flat owners
More on East Ontario Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.