1100 West Grand Avenue, Chicago
technical data · neighborhood and transit
Quick answers
- Does 1100 West Grand Avenue have open permits or code violations?
- Chicago Department of Buildings lists 10 permits, 3 not closed, and 16 violations.
- What is the 2026 conforming loan limit in Cook County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 1100 West Grand Avenue at risk for?
- FEMA's National Risk Index rates the area relatively moderate overall, with elevated tornado and cold wave risk.
Permits and code violations
3 permits not closed out. Unfinished permits pass to the next owner. No open violations.
- Permit - renovation/alteration Apr 2026Complete
Direct developer services: revision of permit to incorporate the change to fiberglass thermal insulation at the exterior walls for a 7 story building, 99 dwelling units, previous permits 101002748 and 101020328. (occupancy group r-2/m/b, type ib) consultant reviewer: globetrotters engineering
- Permit - elevator equipment Jan 2025
Installation of (2) two eg passenger elevators, 3500lbs capacity @ 200fpm, 7 stops, pursuant to plans submitted and subject to city of chicago dept. of buildings elevator bureau inspection.
- Permit – express permit program Nov 2024Complete
Line voltage electrical work. new temporary 800 amp service disconnecting means with 42 circuits. receptacle outlets: 28 . lighting outlets: 105. specific location: temporary construction service 800a 480v.
- Permit – express permit program Nov 2024Active
Fire alarm: new system. associated building permit:b200404726. affects: 100 dwelling units; 1 non-residential units. high-rise building: no. voice communication: no. special locking: no. monitoring type: supervising station . specific location: floors 1 thru 7, roof.
- Permit - new construction Oct 2024Complete
Dds 2019 cbc: new construction for 7 story building with commercial at first floor and 99 residential dwelling units above (occupancy group r-2/b, type ia construction) caissons only permit under 101020328 consultant reviewer: globetrotters engineering
- Permit – express permit program Aug 2024Complete
Revision to permit #101020328. to change of (gc) general contractors.
- Permit - new construction Aug 2024Suspended
Tower crane permit for foundation - freestanding operation of a potain md485b tower crane per plans.
- Permit - new construction Aug 2024Complete
Dds 2019 cbc: caissons only permit for new 7 story building, 99 dwelling unit, 28 indoor parking spaces and 99 bike spaces on permit #101003878 (occupancy group r-2/m/b, type ib construction). consultant reviewer: globetrotters engineering
- Permit - new construction Jun 2018Complete
Installation of 200'tall flag pole structure and associated foundation as per plans. (structural peer review)
- Permit - wrecking/demolition Apr 2009Complete
Wreck and remove a commercial canopy
Chicago Department of Buildings
Safety and environment
FEMA natural hazard risk
Relatively Moderate
Highest for this area: tornado, cold wave. These drive insurance cost here.
FEMA National Risk Index, census tract
Leaking fuel tanks
19 within 1,650 ft
Nearest: Bruss, Bill, 1139 West Grand Avenue (400 ft), open. 4 still open. Ask whether groundwater or soil vapor testing was done.
EPA UST Finder, leaking underground storage tank releases
Brownfield site
1,500 ft
951 W Huron. Former industrial land in EPA's cleanup and reuse program.
EPA ACRES Brownfields
Toxic release facility
750 ft
Sherman Reynolds Inc and 29 more within a mile. Reports chemical releases to air, water or land to EPA each year.
EPA Toxics Release Inventory
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
1,350 ft
Ogden Int High School (1,350 ft), Noble St Chtr Rauner College Prep (1,800 ft), Otis Elem School (2,800 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Major airport
8.8 mi
Chicago Midway (MDW). Aircraft may be audible under approach paths.
FAA large-hub airports
Sinkhole-prone ground
Limestone karst
The bedrock here (dolostone (dolomite), Silurian) can dissolve and open sinkholes. Ask for a geotechnical report and check whether sinkhole coverage is in the insurance policy.
USGS Karst in the United States (OFR 2014-1156)
Conforming loan limit 2026
$832,750
Cook County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
Who lives and works in Chicago
Trading floors, logistics and the deepest architecture stock in America
Chicago carries a full corporate economy at a price the coasts do not match. Neighborhoods are distinct and walkable, two and three flats are everywhere, and the Loop still sets the commute for finance, law and consulting.
- $71,673
- median household income
- 18.9%
- residents aged 25 to 34
- 45%
- households that own their home
What pays the bills
- Finance and trading
- Logistics and rail
- Law and consulting
- Healthcare
- Manufacturing
Who anchors the economy
CME Group · Boeing suppliers · University of Chicago · Northwestern Medicine · United Airlines
The market is shaped around
- Young professionals
- Families buying space
- Two and three flat owners
More on West Grand Avenue
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.